Custom manufacturing
Bomber Jacket Manufacturer — MA-1 & Varsity Silhouette
A bomber jacket is defined by its ribbed trims and the shape they hold. The ribbed collar, cuffs and hem are what make the garment read as a bomber rather than a generic jacket, and they are also the parts that fail first if they are specified to the wrong tension. The other half of the garment is the lining, which most customers only see when they take it off — but a custom lining is one of the cheapest ways to make a jacket feel considered. We build bombers with you from the shell fabric through to the lining and zip.
Fabric weight and construction options
| Weight / type | Material | Best suited to |
|---|---|---|
| Nylon / polyamide | Lightweight shell, 60–90 gsm | Classic MA-1 look, water-resistant, packs small |
| Polyester taffeta | Shell or lining | Cost-effective outer, smooth lining hand-feel |
| Cotton–poly twill | Mid-weight shell | Structured varsity look, easier to print |
| Wool-blend melton | Heavy shell | Varsity and college programmes with a leather-sleeve option |
| Quilted shell | With wadding | Insulated bomber for colder markets |
Available decoration methods
| Method | Specification | Typical use |
|---|---|---|
| Chenille patch | Chest or back | The classic varsity decoration; sewn, not printed |
| Embroidery | Chest, sleeve, back | Works on a twill or melton shell; nylon needs a backing |
| Applique letters | Back panel | Sewn fabric letters for college and team programmes |
| Custom lining | Printed or contrast colour | A cheap, high-impact personalisation visible when worn open |
| Sleeve patch / zip pull | Branded | Small details that lift a plain shell |
Specifications we manufacture to
- Shell
- Nylon, polyester taffeta, cotton–poly twill, melton, or quilted
- Trims
- Ribbed collar, cuffs and hem, tension specified
- Zip
- Centre front, metal or nylon; internal storm flap optional
- Lining
- Custom colour or printed; quilting optional
- Pockets
- Slash, welt, internal chest
- MOQ
- 500 pcs per colourway
- Sampling
- 7–10 days